Court: APPEALS COURT OF MASSACHUSETTS, SUFFOLK
Citation: 13 Mass. App. Ct. 973
Parties: J.J. FINN ELECTRICAL SERVICE, INC. vs. P & H GENERAL
CONTRACTORS, INC. & another; METROPOLITAN DISTRICT COMMISSION, third-party
defendant. (Rescript Opinions.)
Decision Date: March 9, 1982
Judges: HALE, C.J. and ROSE and GREANEY, JJ
This is a claim brought by an electrical subcontractor (Finn) against the
general contractor (P & H), and its surety (United States Fidelity and
Guaranty Company), to collect monies allegedly unlawfully withheld under Finn's
subcontract to perform certain electrical work on the renovation of a public
arena in Revere. The defendants brought a third-party complaint for
indemnification against the Metropolitan District Commission (MDC). The
plaintiff then moved for summary judgment against both defendants and a special
master recommended that the motion be allowed. A judge of the Superior Court,
after consideration of the master's report and "personal examination of
the file," found that a genuine issue of material fact did not exist and
allowed the motion. The judge then properly certified the immediate entry of
judgment against both defendants for the full amount claimed with interest,
legal fees, and costs. See Mass.R.Civ.P. 54(b), 365 Mass. 821 (1974); Stock v.
Fife, ante 75, 76 n.2 (1982). The defendants appealed. There was no error.
1. The dispute between Finn and P & H concerned Finn's obligations under
its subcontract to perform certain work in connection with the refrigeration
control wiring. As required by the contract documents, the dispute was referred
to the MDC's project engineer, who found (first orally and later in writing)
that the work in question was not Finn's responsibility, but that of P & H.
The provision for referring disputes to the engineer gave him broad powers to
decide "all questions . . . as to the performance . . . of the several
kinds of work to be done under [the] contract, and [to] decide all questions .
. . as to the interpretation of the . . . specifications." The engineer's
determination of any dispute within that scope was to be "final." In
these circumstances, it is clear that a court must uphold the engineer's
decision unless that decision (in so far as material here) was arbitrary or
capricious, unsupported by substantial evidence, or based upon an error of law.
G. L. c. 30, Section 39J. See Benjamin Foster Co. v. Commonwealth, 318 Mass.
190, 208-209, 61 N.E. 2d 147 (1945); Hampden [13 Mass. App. Ct. 974] Cornice
Works, Inc. v. Leo Spear Constr. Co., 348 Mass. 798, 799, 206 N.E. 2d 83
(1965). Cf. G.L. Rugo & Sons v. Lexington, 338 Mass. 746, 751, 157 N.E.2d
521 (1959).
[2] The contract documents did not specify any particular subcontractor as
having responsibility for disconnecting the refrigeration control wiring. Thus,
in effect, that matter was left for resolution by the engineer. Viewed against
the materials submitted on the motion for summary judgment, the engineer's
decision raised only questions of law for the court. Based on the case law
cited above, the judge could properly have concluded (a) that the decision was
not rendered arbitrary solely by reason of the lapse of time in the issuance of
the engineer's formal written opinion (which was apparently communicated orally
to the parties at the job site shortly after it was requested); (b) that the
engineer had given appropriate consideration to the requirements of both
addenda to the contract; (c) that the engineer properly relied on the
uncontroverted evidence of custom in the electrical trade, which indicated that
the work was not Finn's responsibility, in interpreting that part of addendum 2
which made the electrical subcontractor "responsible for those fixtures
that normally are part of [its] trade" (see Berwick & Smith Co. v.
Salem Press, Inc., 331 Mass. 196, 198 [1954], and cases cited; Limbach Co. v.
George B.H. MacComber Co., 357 Mass. 475, 479-480 [1970]); (d) that the
engineer's decision was, as a result, supported by substantial evidence; and
(e) that the defendants' "verbal recitation of opposing
interpretations" in their affidavit "[did not] raise a question of
material fact." Industrial Engr. & Metal Fabricators, Inc. v. Fontaine
Bros., 2 Mass. App. Ct. 695, 697 (1974), and cases cited. The defendants'
remaining arguments, which seek to postulate triable issues as to the meaning
of the contract, have each been considered, and we find them to be without
merit.
[3] 2. There was no genuine issue of material fact as to whether Finn's claim
was brought within the time period specified in the second paragraph of G. L.
c. 149, Section 29, as appearing in St. 1972, c. 774, Section 5. The statement
in the sixteenth paragraph of the affidavit of P & H's treasurer indicates
on its face that it was not made on the affiant's own knowledge. See Great
Barrington Sav. Bank v. Gens, 8 Mass. App. Ct. 942, 943 (1979). Moreover, the
document upon which that statement depends could have been found deficient
because it did not specifically contradict facts alleged in the affidavit of
Finn's vice president which show that the claim was timely brought (see
generally A. John Cohen Ins. Agency, Inc. v. Middlesex Ins. Co., 8 Mass. App.
Ct. 178, 182-183 [1979]), and because it was not shown that the document would
be admissible in evidence. See Mass.R.Civ.P. 44(a), 365 Mass. 807 (1974). These
considerations warranted a conclusion as matter of law that Finn had complied
with all the applicable requirements of G. L. c. 149, Section 29.
Judgment affirmed.
END OF DECISION